Always Risk On
IIndex

Tape

Every note that has been on the board, newest first. Each one carries one number, and links its write-up when there is one.

  • The home page can load 66.7 KB of gzipped JavaScript on the production build, GSAP and its lazy chunks included, against a budget of 90 KB, and the budgets gate fails any page that goes over.
  • Archived the foundation's rulings and ledger at 165 commits, and 93 of them are fixes.
  • The foundation's last fix left 2,053 unit tests passing, counted by vitest on a clean checkout of that commit, and not one real page existed yet.
  • The disclosure scan's last fix folds Armenian and Cherokee look-alike letters before matching, so each of its 25 terms still hits when someone spells it with the wrong alphabet.
  • The last of the 63 foundation tasks closed, the one that renders diagrams to PNG for the feed and the markdown twins, and a final review of the whole run came next.
  • 27 September closed on 95 commits across a 23.8 hour span, the busiest day of the build so far, and that span is commit times, not hours at a desk.
London 14 notes on rotation

Every note

30 Sept 2026

TimeNoteFigureChangeKindWrite-up
05:36HOME PAGE JS The home page can load 66.7 KB of gzipped JavaScript on the production build, GSAP and its lazy chunks included, against a budget of 90 KB, and the budgets gate fails any page that goes over.66.7 KBResearch

28 Sept 2026

TimeNoteFigureChangeKindWrite-up
18:18FOUNDATION COMMITS Archived the foundation's rulings and ledger at 165 commits, and 93 of them are fixes.165Build
16:37UNIT TESTS The foundation's last fix left 2,053 unit tests passing, counted by vitest on a clean checkout of that commit, and not one real page existed yet.2,053Build
16:36DISCLOSURE TERMS The disclosure scan's last fix folds Armenian and Cherokee look-alike letters before matching, so each of its 25 terms still hits when someone spells it with the wrong alphabet.25Build
11:26TASKS DONE The last of the 63 foundation tasks closed, the one that renders diagrams to PNG for the feed and the markdown twins, and a final review of the whole run came next.63Build

27 Sept 2026

TimeNoteFigureChangeKindWrite-up
23:54BUSIEST DAY 27 September closed on 95 commits across a 23.8 hour span, the busiest day of the build so far, and that span is commit times, not hours at a desk.95Build
09:57FAN PATHS The fan behind the wordmark draws 180 seeded price paths, and the seed is the London date, so everyone sees the same fan on the same day.180Build
09:57FAN SEGMENTS 180 paths of 120 steps each comes to 21,600 line segments, which is a lot to ask of a phone on every frame.21,600Build
05:39FONT FILES The font pipeline cut four open-licence families down to 6 files, and the biggest came to 56.5 KB against the 70 KB a file is allowed.6Build
04:32GATE STEPS The gates harness first ran as 14 steps, from type checks through to the browser, and one red step makes the whole run red.14Build

26 Sept 2026

TimeNoteFigureChangeKindWrite-up
15:31TOPICS SET The search section of the spec set a closed list of 7 topics, and adding one takes a version bump and my sign-off, so there are no free-form tags.7Research
15:13TEMPLATES FIXED The spec fixed the write-ups at four templates, teardown, build log, case and field note, before a line of code existed.4Build
15:03DRAFTS IN Three design drafts went into the first commit with the research and the spec, and draft C, the floor, is the one this site is built from.3Research
14:31DRAFT SHOTS A little script shot every draft the same way at phone and desktop width in both modes, and with the floor's second pass that came to 207 PNGs, which is a lot of pictures of three web pages.207Research